By obtaining a permit you are assuring that your project will be designed and completed to meet or exceed all safety standards written by the International Code Council and adopted by the Village of Hampshire. 

Please review the requirements in the Building Permit Application Packet before you fill out the application to help assure your permit is processed in a timely fashion. Failing to provide the necessary information will likely delay the approval process of your project.

Here are some helpful points to be aware of:

  • A completed building permit application is required for all building permits. 
  • All information must be filled in on the application.
  • All submissions require two (2) full size (i.e. not reduced) sets of certified plans for one and two family dwellings; Four (4) sets of certified plans for all other (commercial or industrial)
  • For miscellaneous permits, a detailed drawing that clearly shows your plans for construction will be acceptable.
  • State the total number of square feet per floor; total gross floor area (include non-habitable space). Provide this information for each floor, including basement.
  • Height should be measured from grade to the center line of the roof as measured along the front of the building.
  • A plat of survey shall be submitted detailing the foundation location (including process, decks, etc.) and lot grading in accordance with the approved subdivision grading plan and setbacks for front, rear and side yards required for zoning. Additional review exists, such as substantial acreage draining across the property.

Submit proof of (where applicable):

  • Electrician (name and address)
  • Plumber (name, address and state license number)
  • General Contractor (name and address)
  • Mechanical Contractor (name and address)
  • Demolition Contractor ((name and address)

Forms: